File #: 16-478   
Type: Resolution (Consent) Status: Passed
File created: 9/14/2016 In control: Public Works
On agenda: 10/11/2016 Final action: 10/11/2016
Enactment date: 10/11/2016 Enactment #: 2016-291
Title: Commissioner Philbeck - To Award a Construction Contract and Authorize the County Manager to Execute said Contract to Triangle Grading & Paving, Inc. for Construction of Unit II, Phase 2 at the Gaston County Landfill at a Cost Not to Exceed $3,760,340.70 (100% Solid Waste Fund Balance Appropriation)
Sponsors: Tracy L. Philbeck
Indexes: Construction, Contract
Attachments: 1. Adopted 2016-291, 2. BCR - Gaston County Landfill ($3,760,340.70)

title

Commissioner Philbeck - To Award a Construction Contract and Authorize the County Manager to Execute said Contract  to Triangle Grading & Paving, Inc. for Construction of Unit II, Phase 2 at the Gaston County Landfill  at a Cost Not to Exceed $3,760,340.70  (100% Solid Waste Fund Balance Appropriation)

body

STAFF CONTACT

Ray Maxwell - County Engineer/Director - Public Works - 704-862-7551

BUDGET IMPACT
budget

Appropriate Solid Waste Fund Balance.   No additional County funds.

body

BUDGET ORDINANCE IMPACT

N/A

BACKGROUND

The Gaston County Solid Waste Division is committed to providing a safe, economical, and environmentally sensitive waste disposal facility for the citizens and businesses of Gaston County which meets or exceeds all applicable State and/or Federal regulations.  Consistent with the NC Solid Waste Management Rules (15A-NCAC-138), Gaston County is continuing to expand its current landfill site in compliance with Federal Subtitle D regulations which became effective on January 1, 1998.  As existing landfill cells near capacity, new cells are permitted and bid for construction.  Upon completion, these subsequent landfill cells or subcells will provide permitted and compliant landfill space for waste placement.  Over the past few years, Gaston County has excavated soil borrow and secured permits for the Unit II, Phase 2 area.  Unit II, Phase 1 is nearing capacity and additional lined space is now needed.  Space is being used more quickly than anticipated due to increased waste disposal volumes.

 

Construction bids for Unit II, Phase 2 were publicly advertised on September 8, 2016 and a pre-bid conference was held at the site on September 15, 2016.  Sealed bids were publicly opened on September 29, 2016 with the following results:

 

CONTRACTOR                                                                                    LOCATION                                                                                    BID AMOUNT

 

Triangle Grading & Paving, Inc.                                          Burlington, NC                                                                                    $3,760,340.70

Earnhardt Grading, Inc.                                                               Stanley, NC                                                                                    $4,438,432.07

Atlantis Commercial Group, Inc.                                          Tyrone, GA                                                                                    $5,096,163.00

Shamrock Environmental Corp.                                          Browns Summit, NC                                                               $6,199,946.00

 

Based on the bids received, this Board Action deems Triangle Grading & Paving, Inc. as the General Contractor submitting the lowest, responsive, responsible bid.  Approval of this Board Action formally selects Triangle Grading & Paving, Inc. to perform the construction work associated with this project, directs the County Attorney to draft all necessary contract documents, and authorizes the County Manager to execute said documents in an amount not to exceed $3,760,340.70.  Further, approval of this Board Action authorizes the County Attorney to draft all the necessary contract documents and authorizes the County Manager or his designee to execute said documents for HDR Engineering, Inc. to provide construction administration services totaling $408,000.00.  No General Fund appropriations are necessary as a result of this Board Action.